EU-SCORES

European Scalable Offshore Renewable Energy Sources



The Horizon 2020 green deal project EU-SCORES, led by the Dutch Marine Energy Centre (DMEC), will demonstrate the combination of offshore wind- with wave- and offshore solar energy. This will pave the way for bankable offshore multi-source energy parks by 2025 across Europe and beyond. These multi-source energy parks will use offshore space more efficiently and balance the electricity grid to achieve a resilient and cost-effective 100% renewable energy system.

EU-SCORES-Logo

SOLAR-WIND



A 2.6 MW grid-connected offshore solar system by Oceans of Energy is going to be installed 2 km off the Belgian coast at the Blue Accelerator test site close to a bottom-fixed Parkwind wind farm. The demonstration will focus on the complementary production profile of offshore solar to wind parks, the electrical integration in existing infrastructure and the survivability of such a large floating structure.

  • 2021-2022
    Preparations
  • 2023-2024
    Deployments
  • 2025
    Scale-up

Preparatory Phase (2021-2022)

A front-end engineering design study (FEED) is performed. It assesses (1) the environmental impact, (2) detailed cost analysis and (3) technical design to install a 3 MW offshore solar PV system. During this preparatory study, all permits to build the offshore grid connection and deploy the floaters will be obtained. The preparatory study is planned to be concluded in October 2022.

Deployment & Testing (2022-2024)

After all permits have been obtained, the construction of the offshore solar PV system will be finalized and step-wise deployed. The floaters will be designed and built in the Netherlands. Subsequently, the floaters will be transported to the Port van Oostende in Belgium, where local contractors will be hired to deploy the system early 2023. At the same time, the new export cable and the needed floating electrical infrastructure will be put in place. The deployment is planned to last for approximately two years. It will continuously deliver electricity to the local Belgium grid.

Scale-Up (2024-2025)

In EU-SCORES we work with multiple large-scale project developers, utility companies and grid owners. This collaboration should enable a rapid scale-up after the tests are concluded successfully. More information on the Scale-Up will follow soon.

EU-SCORES-Logo

WAVE-WIND



A 1.2 MW wave energy array consisting of 4 wave energy converters from CorPower Ocean will be deployed and grid connected at the Aguçadoura test site in Portugal. The production profile will be compared to OceanWinds’ offshore floating wind farm WindFloatAtlantic. In addition to the wave array, a floating electrical connection hub will be designed and build by CorPower which enables the interconnection with the offshore wind infrastructure. Next to that, a novel subsea electrical T-connector will be designed, tested, and acquired.

  • 2021-2022
    Preparations
  • 2023-2024
    Deployments
  • 2025
    Scale-up

Preparatory Study (2021-2022)

A front-end engineering design study (FEED) is performed. It assesses (1) the environmental impact, (2) detailed cost analysis and (3) technical design to install a 1.2 MW wave energy array and its floating connection hub. During this preparatory study, all permits to build the offshore grid connection and deploy the floaters will be obtained. The preparatory study is planned to be concluded in October 2022.

Deployment & Testing (2022-2024)

After all permits have been obtained, the construction of the wave energy array will be finalized and step-wise deployed. The system will be built and tested in Portugal. There, local contractors will be hired to deploy the system early 2023. The deployment is planned to last for approximately two years. It will continuously deliver electricity to the local Portuguese grid. The floating connection hub of SBM offshore will be designed and built throughout this step and will allow for a rapid scale-up.

Scale-Up (2024-2025)

In EU-SCORES we work with multiple leading project developers, utility companies and grid owners. This collaboration should enable a rapid scale-up after the tests are concluded successfully. More information on the Scale-Up will follow soon.

LARGE-SCALE

Technical, Financial & Regulatory De-Risking



To enable large-scale multi-source parks in the near future, all necessary aspects of their implementation are taken into consideration. The technical de-risking investigates the layout, mooring, electrical infrastructure, environmental monitoring, autonomous robotic inspections & lessons learned during two large-scale deployments. The financial de-risking provides business cases, including green hydrogen production, for several regions & learning rate-based cost reductions of wave- & offshore solar energy. The regulatory de-risking evaluates current regulations, provides policy recommendations & engages with relevant stakeholders.

NEWS



PARTNERS

See all our European Partners by clicking on the map.

See all our European Partners.



Belgium
Provinciale Ontwikkelingsmaatschapij West-Vlaanderen (POM-WVL)
Finland
Lappeenrannan-Lahden Teknillinen Yliopisto LUT (LUT)
France
INNOSEA Aqualisbaemar LOC (INNOSEA)
Germany
RWE Renewables GmbH (RWE)
Ireland
Exceedence Ltd. (Exceedence)
Western Star Wave Limited (SBE)
Italy
Enel Green Power SPA (EGP)
RINA Consulting SPA (RINA-C)
Netherlands
Dutch Marine Energy Centre (DMEC)
Oceans of Energy (OOE)
Technische Universiteit Delft(TU Delft)
SBM Schiedam BV (SBM)
Portugal
Labelec - Estudios, Desenvolvimento e Actividades Laboratorials SA (EDP LABELEC)
Instituto de Engenhariade Sistemas e Computadores, Teconologia e Ciencia (INESC TEC)
WAVEC Offshore Renewables (WAVEC)
Sweden
CorPower Ocean AB (CPO)
Uppsala University (UU)

Belgium

POM West-Vlaanderen Partner-Logo
Ocean Energy Europe (scale up advisor)
Parkwind (scale up advisor)

Finland

LU University Partner-Logo

France

INNOSEA Partner-Logo

Germany

RWE Partner-Logo
EnBW (scale up advisor)
TenneT (scale up advisor)

Ireland

EXCEEDENCE Partner-Logo
Simply Blue Partner-Logo
Simply Blue Group (associated partner)

Italy

Enel Green Power Partner-Logo
RINA Partner-Logo

Monaco

SBM Monaco (associated partner)

Netherlands

DMEC Partner-Logo
Oceans of Energy Partner-Logo
TU Delft Partner-Logo
SBM Offshore Partner-Logo
TenneT (scale up advisor)
ENECO (scale up advisor)

Portugal

edp labelec Partner-Logo
INESCTEC Partner-Logo
WavEC Partner-Logo
PT (associated partner)
REN (scale up advisor)

Spain

OceanWinds (scale up advisor)

Sweden

CORPOWER OCEAN Partner-Logo
UPPSALA UNI. Partner-Logo

Switzerland

Imodco (associated partner)

United Kingdom

RWE renewables UK (associated partner) Innosea Ltd (associated partner) RINA Tech (associated partner)

Contact



Follow us on social media


LinkedIn X (former Twitter)

Reach out to us

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 101036457.