Energy multi-use parks where wave- and offshore solar energy is integrated in offshore wind parks can mitigate the current climate, energy, and biodiversity crises. Making use of renewable energy sources, the electricity produced is carbon-free. By generating energy locally off the coast, energy independence and security can also be increased. Furthermore, other uses such as […]
Preparatory Phase (2021-2022)
A front-end engineering design study (FEED) is performed. It assesses (1) the environmental impact, (2) detailed cost analysis and (3) technical design to install a 3 MW offshore solar PV system. During this preparatory study, all permits to build the offshore grid connection and deploy the floaters will be obtained. The preparatory study is planned to be concluded in October 2022.