As competition for marine space grows, integrating wind, wave, and solar into multi-use parks is crucial for an efficient and resilient grid. The new public deliverable, “D5.10 Technical and Logistical Optimized Layout for Utility Scale Multi-use Parks,” led by DMEC under the EU-SCORES project, highlights: This report provides a technical blueprint for the next generation […]
Preparatory Phase (2021-2022)
A front-end engineering design study (FEED) is performed. It assesses (1) the environmental impact, (2) detailed cost analysis and (3) technical design to install a 3 MW offshore solar PV system. During this preparatory study, all permits to build the offshore grid connection and deploy the floaters will be obtained. The preparatory study is planned to be concluded in October 2022.