Reaching our offshore energy targets is an opportunity to reconcile nature with offshore wind farms and grid developments was the core message at the “Strong Winds, Thriving Seas” conference. DMEC showcased how the EU-SCORES project is doing this by making smarter use of both the offshore space and grid infrastructure. The project contributed to a […]
Preparatory Phase (2021-2022)
A front-end engineering design study (FEED) is performed. It assesses (1) the environmental impact, (2) detailed cost analysis and (3) technical design to install a 3 MW offshore solar PV system. During this preparatory study, all permits to build the offshore grid connection and deploy the floaters will be obtained. The preparatory study is planned to be concluded in October 2022.